Skip to content
← Industries
Built Environment

Construction & Architecture

When the same number differs from document to document, permits and contracts start to move.

Background: real product screens and synthetic concept imagery — no customer-identifying information.

The gross floor area in the design summary against the total in the area schedule, each review comment against what the drawings actually show — checked one by one, with eyes and a calculator, at every revision. A single summation error in one table turns directly into permitting and contract risk.

Who lives with this problem

Drawing reviewers at contractors and design firms · permitting managers matching review action items against drawings · architectural design managers at contractors

What we solve here

The problems we solve in this industry

Cross-Document Verification

The same number differs from document to document

Whether the gross floor area in the design summary matches the total in the area schedule, whether the excavation level in the calculation sheet matches the elevation on the section — every revision is checked line by line with eyes and a calculator. One summation error in one table becomes a permitting and contract risk.

How we solve it

Summation, ratios and verdicts are performed only by deterministic decimal code, and the LLM is forbidden to do arithmetic. Results pass an independent check that is blind to the first conclusion and are issued in exactly four states (VERIFIED / MISMATCH / NEEDS_REVIEW / NOT_APPLICABLE), with every value traceable back to page, cell and coordinate. Click a number and the matching location in the drawing opens.

Engineering depth and maturity →
Drawing Intelligence

A drawing is only a drawing to the human eye

Pulling a single valve list out of hundreds of P&ID sheets still means retyping into a spreadsheet, and nobody can guarantee that what was typed matches the drawing. In many drawings the text has been frozen into curves — it cannot even be copied.

How we solve it

Deterministic first — we read the geometry and text of the vector PDF directly and decode tag grammar, symbol vocabulary and annotation conventions as explicit rules. AI is brought in only as a fallback on the last stretch determinism cannot reach, and every value carries its source coordinates and a confidence level so a person can check and approve it on the drawing itself. A verdict we are not confident in is never passed silently.

Engineering depth and maturity →

Start with one set of your own construction & architecture documents

We run the technical verification demo on your real drawings and calculation sheets — see for yourself how evidence attaches to every verdict.